PRICE,TERMSANDCONDITIONS
ThisContractismadebyandbetweentheBuyerandtheSeller,wherebytheBuyeragreestobuyandtheSeller agreestosellthementionedequipmentaccordingtothetermsandconditionsstatedbelow
1/
Description&Type |
Qty |
UnitPrice |
Amount |
3200 mm
ProductionLineofPPSpunBondNon-woven
JW1600-6 |
1 UNIT |
|
|
Total |
|||
CIF BOMBAY
|
2/Theproduction linesellerofferedisdesigned toprovideanannualoutputof3200TonsPPspunbondnon-woven fabrics(outputcalculationisbasedonproducedfabricweightedat50g/m2,equipmentrunning8000hoursannually),
theeffectivewidthof producedfabricis3200mm(50g/m2),weightrange10—200g/m2.
3/Technicaldocuments and drawing for conductingrequired civil work, equipmentoperation, installation and maintenancemanual,productionwillbeprovidedbyseller.
4/Sellerprovidesturnkeyserviceto buyer, isresponsibleforlayoutdesignanderectionofproductionlineatcustomer site,productionlinecommissioning,operationtrainingtolineoperator.Sellerpaintsthemechanicalpartofproduction lineto colorthatbuyerchosenafter wholemechanicalpartsare installed.
5/ Buyer isresponsibleforprovidingworkshopthat canmeet applicationrequirementofofferedproductionline.Buyer providesassistance,collaboration,utilityfacilitylikewater,electricity,compressor-air whensellerisbuildingand erectingsteelplatformatbuyersite.
6/Sellerisresponsiblefordispatchingrequired2commissioningengineersand4installationworkerstobuyersite,and buyer taking care of the costs of seller’s engineers and workers at buyer site such as: round trip tickets,accommodation,travel
7/Packagingrequirement: largepartswrappedinseveralturnsoffilms,smallpartsboxedinwoodencrate,each packagedis numberedandpackedtoeasyloading/unloadingand installationpurpose.
8/Shippingmethod:viaboat
Pointof delivery:ShanghaiPort
9/DeliveryMode:separateshipmentof productionlineis notallowed.
10/Deliverytime:shipin 3monthsafterdownpaymentis received.
11/ Noticeofdispatchwillbeprovidedoneweekbeforecompletedate ofproductionlineto give buyer enoughtime to makearrangementforacceptanceinspection.
12/
— PaymentTerm:30%cashin advancewithinoneweekbyTTaftercontractis signed.
–65%by TTwithinoneweekafteracceptance inspectionispassed.Shipment ismadeinoneweekafter65%is received.
Balance5%to bepaidbyTTin six monthsafteracceptanceisacknowledgedandqualifiedfabricis produced.\
13/Equipmentacceptancecriteria: equipmentisacceptedandinspectedaccordingtoChina standardofnon-woven fabricself-madeequipmentindustry,acceptance testprocedurestipulatedbothbysellerandbuyer.Warrantyis provideda periodof oneyearfrom thedatefinalacceptancetestis passed.
14/Liability forbreachofcontract:Sellershallindemnify andsaveBuyerharmlessforphysicaldamageandloss resulting directly andsolelyfromproduction linedesignfailure,qualityissueofmechanical equipmentduringthe performanceof theequipmentonthepremisesofthe Buyer.
15/Arbitration: AlldisputesinconnectionwiththeexecutionofthisContractshallbesettledfriendlythrough negotiation.Ifanattemptof settlementhasfailed,thedisputesshallbefinallysettled inaccordancewithcontractlaw.
16/ this contract isissued intwoidenticalcopies;onecopy isdeliveredtoseller,theotheronetothebuyer.Contract comesintoeffectonceit issignedbybothpartiesanddownpaymentis mad
1-TECHNICALSPEC:
PROJECTNAME: ProductionLineof PPSpunBondNon-wovenRI-3200-6
RAWMATERIAL: PPchips,pppowder,pp granule,filler
MAXDIAMETEROFFABRICROLL: 1200MM
WIDTHOFPRODUCTIONLINE: 3200 MM
WEIGHTRANGE: 10—200g/m2
PRODUCTIONCAPACITY:400kg/h(calculationbasedonproducedfabricweightat
50g/㎡,widthat 3200mm)
PROCESSSPEED: 15m/min–150m/min
SPUNBONDFIBERFINENESS: ≤2.3 den
2-UTILITY:
INSTALLEDGROSSCAPACITY: 600 KVA
ACTUALPOWER: 320KW
ENERGYCONSUMPTION: 800KWH/TON
POWERSUPPLY: 3X380V, 50HZ
3-LABOR:
WORKER: 10people STEVEDORE: 2people TECHNICIAN: 2people
WORKINGHOUR: 12 hours per 5 workers including:1stevedore, 1 technician and 3 workers
MANAGEMENTANDSALES: 3—5People
4-WORKSHOP:
FLOORSPACEOFMACHINE (LXWXH):17200 X8500X12000
5-CONSTRUCTIONPERIOD:
After receiving the first deposit,the whole project should be completed in 3month